More floor prep

Discussion in 'Pictures' started by dsmart, Jul 27, 2010.

  1. dsmart

    dsmart Well-Known Member

    88
    1
    8
    preparing the floor prior to installing teak parquet blocks
     
  2. Matt

    Matt Well-Known Member Staff Member

    6,328
    1,402
    113
    nice, good stuff that 700 flex.

    so what was your reason for not fitting direct to the plywood you installed?

    What do you use the blue stuff around the edge for?
     
  3. dsmart

    dsmart Well-Known Member

    88
    1
    8
    its a bit long winded...

    the original floor was 14mm eng with 2mm foam u/l, on top of 18mm chipboard with a 7mm foam back, on top of 18mm ply. the ply was fixed to 3" x 2" batons which (it became apparent) were NOT properly secured to a concrete base. having removed the flooring and chipboard, it was obvious the ply had to be removed to see what was going on below. - hope you're following so far! :smile:

    having secured the batons, the floor level had to be built back up to the original level to suit the door frames. so height of original subfloor + floor = 59mm.

    new subfloor = 2 x 18mm ply + 18mm blocks = 54mm. Even allowing for adhesive, the new flooring would still be a fair bit below the door frames.
     
  4. dsmart

    dsmart Well-Known Member

    88
    1
    8
    sorry forgot about the foam....

    since the skirting had been removed, it prevents the smoothing compound running off the edge of the ply. its really useful comes as 15x15mm or 30x30mm
     
  5. doidgey

    doidgey Well-Known Member

    378
    28
    28
    wear do you get the foam from.

    Steve.
     
  6. dsmart

    dsmart Well-Known Member

    88
    1
    8
    i get it from STS flooring. i think they've got about half a dozen depots throughout the south east. I think F Ball make it but im not sure
     