If you cover parquet it sweats and blows off the deck. Rip it up and build the level back up Don't ply over if the sub itsconcrete use a leveling...
I hope the so called surveyor hasn't charged for this :mad:
Only RH% should be used that thing is useless
Right You havent had a proper test done and you definitely can't get an RH reading by waving a protimeter next to hole :eek: You need to find...
Can't test concrete with that one Rich pins are for wood
Ok then the only way to get an RH reading with a protimeter is to drill a hole in the concrete and plug a pobe into it or plug a probe in a yellow...
Did he drill a probe into the floor or put a box down ? In all the tests I've ever done I've never had One as low as that ?
50 quid per m2
15% what ? What did he use to test the floor ? It takes a minimum of 72 hours to do a test correctly !!!!!!!!!o_O
It's definitely wet :rolleyes:
There may not be a dpc under the slab You need to get RH% test done before anything else
How old is your property ? When was it built ? You say the concrete slab is dry Have you had it tested ?
Don't like the edges on it Needs a bevel
Lvt yes definitely Real woods nit a good idea
A bit 45 and its sorted
The flooring forum "The UK's no.1 flooring advice forum :rolleyes:
Last one I Did I took the top first and it dried in two weeks with Ufh on