Yes I would suggest V4 as well
If the joists are level with a 21mm engineered is there any reason why you couldn't fill up to the top of the joists with a solid type acoustic...
Now I know what they have done and they are trying to get out of a hole, they have laid something like we are doing, danskin chipboard with foam...
It seems as if the designer or architect has the drawings up the wrong way, :rolleyes: We are doing a 1400m2 job at the moment just for the...
He never replied ? So can't be that keen
Brajeffflooring
Yes that was me
Yes Andys right it's the Roberts rad-flex,
6mm ply, polysafe, tag trim, flex on blocks:eek:and then Teviot cut to curve with bendy [ATTACH][ATTACH][ATTACH][ATTACH][ATTACH]
I am interested in that, see a big market for renovating Lino and then uv curing the PU coating, doing a paid job next week rather than a sample,...
we have one of them, not bad but its a little slow so we use big dustbins as well on big jobs, looks good [ATTACH][ATTACH]
so its on screed /concrete maybe they have laid it on screed and either the floor was uneven, or maybe no DPM and the moisture has just gone into...
normally when doing ramps we would use green bag and 128/114 and mix it up a little thicker, but because this was for a resin i needed something...
take it up and put down Oak, its very difficult to take a dark hardwood and make it light, is it 5 finger mosaic by any chance? the only way i...