http://www.dobuilddirect.com/msite/productview/Hardwood_WBP_Plywood_114.htm Might be worth getting some sheets and trying them out.
All ply I can find is crap at the minute, don't mind paying for decent materials.
If the floor you're going on is really level and strong then yeah but I'd always use 6mm.
real radio xs 106.1 fm classic rock
I'll second that mate.
A day off and a beer.
It's the best fibre based compound I've used except mapei's fibreplan which is a little dearer but. Sets like glass without needing to do much if...
Is it a tote bag or full mate.
Possibly they do every other building material under the sun.
That's what I'd use a resin based compound they're made to accept more stress and strain, call up mapei see what they think.
Its ridiculous that this day and age people still won't pay for a correct job, especially with all the cowboys around at the minute.
fully agree mate spain are boring, we'll see how it goes but Roy's doing a decent job much better than Cappello's thievery.
Rfms do a decent program bit expensive though, Google it and have a look yourself mate.
I think from what's been said fitted floor is a bit kind. The concrete is going to be way too wet.
I wouldn't ply personally wood and concrete/tile should always have a moisture barrier between them, hence a surface membrane, if I remember...
Ha yeah that's what I just thought.
Or mapei's, they make karndeans ps Addy which is inferior to mapei's own.
also sounds like concrete is too new to fit on, minimum 30 days IF surface dpm being used otherwise at least 6 months depending on thickness,...
It is if you're fully bonding to floor, using the crappy underlay a vapour barrier helps to bring it above 65%
sorry mate didn't check the section