that's rising damp mate, need to dig up subfloor new concrete base, dpm leave 30 days then screed and surface membrane that should help fix the...
it's cheaper than breaking up the old crete, pouring new with a proper dpm, and is quicker that's the only plus side i can see.
burnt ginger sounds a good idea, we may finally remove them from the gene pool.
think we know what's happened, the asphalt's failed going to be expensive.
defo moisture problem, needs investigating.
sounds like that to me mate, although if screeded without slurry coat you might get problems similar.
Stump up for a festool one, cracking bit of kit bit pricey though.
Not much dearer than original
How much
Looks top whats price on it?
Do you like a cup of tea?
And George formby
I can't wear gloves got circulation probs, hands overheat or get cold too easily usually crack and bleed for fun.
If you toughen your hands up you could fit even quicker.
Hit it with a hammer and watch it explode funny.
That's why Michael Jackson only had one glove, makes a lot of sense now.
Never heard of them, just toughen your palms up don't need to know how ha ha.
That's what i meant although the you pass 50 mm depth the time for drying doubles, 4-6 months on a 50 mm slab.
Did I miss something?
A 75mm slab should take around a year to dry well enuogh to Dpm.