The tiles should come up possibly the reason the screed has failed only problem lifting the tiles is the bitumen adhesive may be the dpm if so the...
Bolon for me
Most Europe tile their floors so only need to wait 4 weeks or so beforehand
Takes about 10 years to dry through evaporation rather than 6-12 months
All this should be given as literature to consumer would make our job easier to just say check your info
Congratulations mate got 2 girls myself hard work but well worth it
Always go one better mate :)
Think you'll need more than 1 day mate, eporip the holes then screed 1-2 days later
Egger prestige is cheap and got it in my house not bad for money
Vitality standard, that's all I got really for that kind of money
Using crap gripper and underlay this can happen but proper gripper underlay with the correct tension and it'll wear just as well with or without...
Was it an independent or a shed mate leave it with me i'll find out by tomorrow
Keep the tog rating as low as you can heatflow with tuftex works well.
And don't forget powerstretcher
Either combi felt, crumb rubber or a really dense pu think cloud 9 contract
And defo double bank your gripper and put some infront of the plates too, I always dex the backing as well.
Think it's called vulanto or something now though
Vusta is similar money but you get a 0.55 mm wear layer the bevelled edge planks look the biz
It won't work mate if its wood block chances are they're gonna have to replace concrete to install ufh the addy used is probably bitumen based...
You could also try a click lvt cost similar to a decent laminate probably closer to £2000 same benefits of lvt but quicker installation time and...