Bondworth are competitive on price, Westex if you need full rolls their contract gear is cracking
Think anything takes longer than rapid dpm to dry
Jhs do some man made Wilton's will do the job nicely
If it's a mare get sid out to inspect it mate
Craptastic
My knowledge on that started from matt before I began reading everything I could get my hands on to do with concrete application and construction
Bit of a hair raising moment there mate
Lengthening the drying time is actually advantageous it makes the concrete stronger in the long run
Structural subfloor should be 22mm + really but we all know what builders are like
no worries
Not seen or tried their new ones, but are they gonna do the old chestnut it's the subfloor that's failed or are they gonna stand by their claims?
Epoxy surface membranes still shouldn't be used as a proper dpm, all the tech sheets except for ardex dpm 1 c state they still need a mechanical dpm
I'll ask the question tomorrow it's definitely a balta carpet though
Ding ding give the man a medal guessed it in 1
Welcome mate got any technical details on the product or web link?
Should be like glass really flat as a pancake, the levelness isn't really an issue unless it is to you
Same as Wes said really we need a bit more info, although gluing down is the best way to install subfloor will need some attention first
Floor will need grinding or scabbling to remove addy residue before priming and screeding, as for addy used depends who fitted them if he was old...
No sorry
Even 17 years ago they could have contained asbestos