Timbermate Excel will do the job and is worth spending the extra over the cheaper foams. Sent from my iPhone using Tapatalk
Nobody knows yet, looks like it’s still going to be a while before anyone should be back fitting (domestically especially) we’ll have to wait and...
No mate you don’t prime before dpm just make sure the concrete is clean, dry and level and follow manufacturer instructions. I mentioned Ardex...
Grind it all down smooth and remove all of the residue, Ardex dpm 1 c at 250 microns, Ardex P4 primer or P82 then Ardex K11 screed allowing drying...
Did he leave a box on the floor or drill a hole into the concrete and put something in it? If not he didn’t do a proper moisture test and you’re...
Grind, surface dpm then prime and screed, don’t prime first or the dpm will fail. You really need to take some accurate moisture readings in the...
Throw that underlay away it’s horrendous the wood needs to be bonded directly to the subfloor, first you need to grind the concrete clean, then do...
65% for wood direct bonding mate, for wood you always need a surface dpm. Sent from my iPhone using Tapatalk
Board it out first the floor needs to be flat and firm, plane any peaking joints, make sure all the floorboards are sound and firmly fixed then...
The screed sounds buggered to me, it might be a full dig out and replace with you saying it was crumbling it doesn’t sound good. I would...
That’s why I mentioned regupol too, it’s extra layers that’ll help without creating a false floor. Sent from my iPhone using Tapatalk
Depends on the audio frequencies mate, they don’t deal with high-mids and high frequencies the same as low-mids and lows. Sent from my iPhone...
No worries Sent from my iPhone using Tapatalk
I really don’t like chipboard and that’s what they’re made for so I would personally give them a swerve. The ideal option is expensive and would...
The “best” to go for would be to change the chipboard to floorboards or ply, use Regupol then a quality carpet underlay. Sent from my iPhone...
You’ll need to bring the Rh% below 65% so even if you use a mechanical dpm then screed you’ll still need to epoxy over your screed, plus you’ll be...
On a concrete base of that age especially you’ll need to check the actual Rh% in the concrete, the compressive and flexural strength too before...
Honestly don’t think we’ll be back for months not weeks Sent from my iPhone using Tapatalk
[emoji2961] Sent from my iPhone using Tapatalk
And here’s me complaining about my 300/30 not being enough [emoji38] Sent from my iPhone using Tapatalk