What's the name of your UFH system?
5mm screed over the top of the boards? Could have done with a 10mm minimum and also sounds like the fitters didn't lay your planks in 'wet set'
The new slab with the UFH pipes buried, how long was that base down before the floorlayer screeded over it?
New floor!
If you've got ir then yeah don't see why not
Skirts first if you already havnt screeded but if its screeded already then just fit then bang the Skirts on after and give them a firm fitting...
I'd drill whisk that 500 nice and thick ish then trowel it down. Wait for it to harden enough for you to stroke it with a wet trowel for a nice...
Same adhesive all the way. KE66 OR KE49 wet set (leave glue to air few mins and fit straight into it at a section at a time) I personally...
Nope, too much faffing about. If he knew what he was doing then it would have looked a lot neater and smoother than that
What a mess
I never bother sanding mine if it don't need it. I do know fitters that do it everytime but I've had no issues in the 20+ years
Is moaning a sport?o_O
I'm into the formula 1 and the Boxing even though both have been predictable the last few years and physically I like to train 3-4 times a week in...
I'd run it through myself
Spot on, looks neat :cool:
Plunge saw on Amtico :eek::D I prefer without borders myself Otherwise border first then cut the field into it. Remember to rebevel your cuts...
Is the ufh a mat with the tile laid directly on top of it or we talking water fed buried??
Jeeeeeeeez, all that for a 'spam drop' :D
I've seen some of the 90's builds like this and have come across a fair bit of damp with this system, maybe it's all changed now but I had to rip...
You got Bifolds? South facing?