Another option would be to go with the joists and ply over the top, but then put the ply throughout the whole lot. If it is thick enough ply then...
Glue down most likely. Could do either though I guess?
I'm having an extension and the existing space has a concrete screed finished floor. The extension area has been speecified to have the same,...
How soon do you reckon I should wait after the screed is put down? 70mm screed
It will be a standard cement screed as far as I can tell. That's what is specified on the drawings. In any case it sounds like I need to wait as...
It hasn't been laid yet. I will speak to the builder to see what they will be using. From what you are saying it doesn't really seem like there is...
I'm having an extension to my kitchen and have purchased some engineered oak flooring ready to be fitted. The floor will need to be glued down....