Probably about 5mm,but because of the door opening the very it's most inconvenient! Sent from my ONEPLUS A3000 using Tapatalk
Yes, quite sufficient (1 inch total) and the floors were acclimatized for 3 weeks. Sent from my ONEPLUS A3000 using Tapatalk
It was about 8 weeks and the moisture content was around 5%. I also did the test of putting down a plastic over the sub floor and no moisture was...
We had our house refurbished and part of this included filling the floor with concrete and then laying an engineered oak floor above it. The floor...