I back mark them. Takes time but neat at the end. I Never hook blade the bitumen backed tiles. Nightmare to do.
Yes Mario, can you do 22mm an 25mm too mate. Good price that.
[ATTACH] [ATTACH] [ATTACH] Some grey Moduleo planks
I use 22mm or 19mm on 6mm ply and 25mm on 9mm ply mate
Mine is going strong.
Put your roller pictures here. Mmmmmm lovely !!!! [ATTACH] [ATTACH]
I have a 60m2 ply job coming up mate if you want to do your demo on that ;-)
Which screed did you use Ste. Sounds like the best idea on cost that. When I use granno I do half bag to a full mix. That's what I was shown....
I have this job already for the LVT. But no prep. The builder wants me to do the prep now. My mate graham is going to call in an look tomorrow...
Yes mate heating system is on site. The old wall parts are coming out and filled with dpm sheet an concrete.
Woodblock are all up mate, quarry's coming up tomorrow. Will need to build up about a inch in parts.
The heating system is set in theses panels which are glued down to my subfloor. Got to find out can they be glued to the dpm. Then the 9mm...
Cheers for that :)
Done 4 grey plank floors in the last 2 months.
Been to look at a job which is 5 different levels. Got to get it flat to receive underfloor heating panels then that will have plywood on top....
Good luck with it mate. I've seen a mad one today. 5 different floors in one room. Going to take loads of prep. Will do a post on it.
The dr schutz kit is around £20- £30. Well worth it to keep your expensive floor looking great for years to come.
Think a hour? But not used any ( on site ) so would have to see.
Used alot of level it 2, love it. Seamed thick to me but dried lovely an flat. Used level it 3 on 3 jobs with the bond it bottle, 1st job didn't...
Alright mate