Had a request today on a very tall pointed building in London to lay a specially made carpet with the borders already inlaid, To be laid on two layers of underlay, two areas are lift lobbies around 5m long, but a larger area which will be around 15m long by 5m Now would you use two layers of durafit, sticking both together or try to stretch it ?
I used to do the playbarn type things, you sometimes see attached to pubs. We used to use 2 layers of Durafit. The top one at right angles to the bottom. 1st layer taki 2nd F3 Carpet F3 It actually felt o.k underfoot. Not spongy at all.
I've double stuck it with cloud 9 contract on a domestic job and it was fine! I would probably be ****ting myself about it on a contract job tho
thanks boys its for a very high end contract job, hotel bedrooms , and restaurant, meeting rooms its all in hand tufted carpet and some of the areas are 19m x 7m in hand tufted carpet with a beautiful patten its like a work of art, its not just one its about 10 areas Anybody up for a challenge