hi guys. I have a wood job to price. 3 areas have carpet over concrete floor the other has parquet over the concrete then the carpet. The customer wants all areas level so the wood floes rthrough hsll into lounge, dining area, therfor all the parquet floor needs to come up. What would i need to? what would i need to put down before the wood goes down? My wood knowledge is very limited. CHEERS
Customer wants engineered wood so if i na over bitumen, that's fine? I kno na can go over most things.