Amtico over underfloorheating day after screed

Discussion in 'Vinyl / Impervious floor coverings' started by scotflooring, Jun 21, 2010.

  1. scotflooring

    scotflooring Well-Known Member

    686
    186
    43
    Alright chaps, have posted on another forum putting a floor down for a customer. Basically underfloor heating put in with sand cement screed 4 months ago and has beed commissioned and is dry (checked MMS) The problem I have is she wants the amtico to be laid the day after the screeding, have explained about the system having to be commissioned from low up to 27 degree over a period of time and then putting down with high temp but wants done straight away. Do you lads have any pictures or official documents showing failures or things especially explaing about hydo pressure as it is a good sized job and don't want to walk away and feel if there is previous evidence they will look at that.

    Cheers,

    Brian
     
  2. admin1

    admin1 Well-Known Member

    474
    8
    0
    Hi, we have a general advice leaflet on how to treat your UFH system before, during and after installation of a wooden floor (don't think there's much difference with the method, precautions for Amtico?
     
  3. Matt

    Matt Well-Known Member Staff Member

    6,328
    1,402
    113

    Amtico is treated exactly the same way as wood. Do you have a link to your advice leaflet for them woody?
     
  4. admin1

    admin1 Well-Known Member

    474
    8
    0