hi guys. A customer asked me a question today that had me stumped. Why do I got gripper so small when I’m sticking it to a concrete floor. I have always done it as it’s the way I was trained I know it’s got to be around 15cm a piece but I thought it was to spread the load of the stretch over the smaller bits. Is this wrong?
Also enable the gripper to have full contact/ bond to the subfloor as it is never super flat and also to follow contour of the wall as they are never straight either
i'm terrible with carpet but my bro says it like Busylay, to keep the gripper stick in contact with the subfloor