Dpm for new cocrete floor

Discussion in 'Subfloor Preparation' started by Haguehags, Aug 31, 2017.

  1. Haguehags

    Haguehags Active Member

    37
    0
    6
    Got a new concrete sub floor which has a damp membrane under and is 100 mm thick and has been down for 5 weeks. I no I can use a epoxy surface dpm on this and wait 24 hrs but was wondering if I could use something along the lines of a a dispertion dpm like ardex mvs 95 just to get it damproofed and screeded on the same day.
     
  2. Spacey

    Spacey Super Moderator Staff Member

    6,503
    1,881
    113
    No You need to use an epoxy
    Thats going read off the scale with a hydrometer
    If you start early doors you could use ardex 1c rapid and screed it in the afternoon
     
  3. dazlight

    dazlight Super Moderator

    7,218
    1,711
    113
    If it's been down 5 weeks and been drying since then you be best doing a test and you could use F78 or Ardex MVS if reading is 90% or lower


    On tapatalk HD
     
  4. Rugmunching

    Rugmunching Well-Known Member

    3,874
    678
    113
    I had one where it was border line roll on application. Was reading 93% but didn't want to take the risk so ardex 1cr went down instead.
    Don't risk it if I was you unless you are willing to leave it longer to get it below a safer lower level for mvs.

    I know mvs is safe up to 95 with 2 coat system but for me anywhere over 90 it gets epoxy dpm.
     
  5. dazlight

    dazlight Super Moderator

    7,218
    1,711
    113
    I'm the same. 75-90 I use f78 etc if 8 can.


    On tapatalk HD
     
  6. merit

    merit Well-Known Member

    8,222
    1,681
    113
    Wakol pu280 is damn good. 2 coats of that will do the job


    Sent from my iPhone using Tapatalk
     
  7. merit

    merit Well-Known Member

    8,222
    1,681
    113
    Just make sure there's no pin holes which means using shit loads


    Sent from my iPhone using Tapatalk
     