Last job of the school work finished today. Had to take out all the benches first, rip out, screed then fit hydro throughout... even toilet and waste came out.. much quicker and easier I think.
as it was all done before everything was fitted initially it just made it easier to rip out and refit.. the toilet was very clean even when the waste pipe came out it didn't have extras... lol
Last week I walked in the school toilet and one of the cleaners was in there having a dump with the door wide open. why??!
Oh yeah, and I had to walk through the changing room to get to the toilet so they must of heard me coming!!!!!