Screed repair

Discussion in 'Subfloor Preparation' started by DarrenP, Jul 27, 2020.

  1. DarrenP

    DarrenP Member

    18
    1
    3
    I have a just under a metre of screed to repair, solid concrete floor, it’s 25mm (a patched area was not bonded to concrete)

    I’m going to slurry and then a 4/1 sand cement/sbr mix

    When you slurry with Portland, should it be left overnight or should I apply the sand/cement mix while it’s still wet and tacky, I see different answers.


    Thank you all.
     
  2. dazlight

    dazlight Super Moderator

    7,218
    1,711
    113
    Wet and tacky.
     
  3. DarrenP

    DarrenP Member

    18
    1
    3
    Thank you,

    Ardex have recommended this,

    ARDEX DPM 1C direct to the smoother or the concrete.

    When cured apply ARDEX R3E and sand blind, allow to cure remove any unbound sand before smoothing with ARDEX K15.
     