So in the past week. Seen it twice. Job I did last week. Building levels up on plywood 1st coat approx 15mm 2nd coat 5mm ish. Blown off floor day after so had to take the lot up. Other job is one I’m doing a repair on. Same though. Screed blown off plywood.
My one is SP101 6mm with screedmaster flex Other one I don’t know but owner of hairdressers said it’s marine ply lol
Well the sheds use to call 18mm wbp marine ply for some reason? What primer mate? Sent from my iPhone using Tapatalk
I disagree with most manufacturers specs for screeding over ply Watering down acrylic primers and using waterbased compounds doesn’t make sense to me ? Adding fibres to a water based screed does not make it flexible It holds it together when it cracks which it does every time
I hate Bostik. Only used it a few times and it’s failed on me more often than not Sent from my iPhone using Tapatalk
I screeded a dentist reception, turned up next day and it was still wet. Not a good weekend for me Sent from my iPhone using Tapatalk